Project organisation
Sub-Projects & Work Packages
The project is divided into 8 sub-projects, in turn grouping a total of 26 Work Packages.
- SP-CP (Coupled reactor Physics and core thermo-fluid dynamics) is led by NRG (NL)
- SP-FT (Fuel Technology) is led by CEA (FR)
- SP-BF (Back-end of the Fuel cycle) is led by FZ Jülich (DE)
- SP-ML (Materials development) is led by NNC (UK)
- SP-CT (Components development) is led by Framatome-ANP (FR)
- SP-ST (Safety) is led by Tractebel Engineering (BE)
- SP-SI (System Integration) is led by Framatome-ANP (FR)
- SP-PM (Project Management) is led by Framatome-ANP (FR)
Project management structure
In addition to its internal management structures, RAPHAEL is constituting 2 Advisory Groups (visit the interactions page for details).


